Fully Loaded Metro Train Automation Project Abstract with Block Diagram

Abstract – In our autonomous train proposed system, AVR controller is used. In this project the arrival of the train in particular station is obtained by the Bluetooth transmitted and receiver section. Whenever the train arrives a station Bluetooth receiver in the train gets the station’s Bluetooth value  and  the  train  get stopped immediately. After the train stops the door of the train gets open and gets closed after particular time. In the door section  passenger counting system is assembled to check whether the seats are full or not. If the seats are full the door gets closed automatically. Passengers count and the station details are displayed in the LCD. After the particular time has been reached the trains to engine get ON and moves to words next station. The movement of the trains is showed in DC motor which is interfaced with the controller. The train incorporates a buzzer to alert the passengers about opening and closing of the door.

More Reports, PPTs :  https://www.spectruminfotech.in

For Projects Contact : +91 7598364645

Mail Us                        : spectruminfotech3@gmail.com

LiFi based Data Communication Project Abstract with Connection Diagram

Leave a Reply

Your email address will not be published. Required fields are marked *

Navigation

My Cart

Close
Viewed

Recently Viewed

Close

Great to see you here !

Your personal data will be used to support your experience throughout this website, to manage access to your account, and for other purposes described in our privacy policy.

Already got an account?

Quickview

Close

Categories